Saturday, June 4, 2011

plan check submittal three: 46MB, 67 page pdf: http://utopiad.org/6az20110601.pdf was submitted on June 1st. on friday, june 3rd we received a few additional corrections in response. we have to add vestibules in front of every stair door at every level, we have to reconfigure our accessible parking shared unloading aisle, and we have to use a synthetic wood siding because wood siding is not allowed to be installed above 30' high. we have made the changes to the plans and are specifying Trespa synthetic wood facade panels. our consultants have a few corrections regarding energy usage calculations and acoustic integrity at mechanical/electrical penetrations.