Hello Ruth-
I made the changes to the P1 and P3 Plans that we
discussed on Friday evening. One copy of each of
these should be delivered to you Monday morning.
P3 plan: I moved spaces 10 and 11 to the south to
prevent vehicles running in to the elevator
P1 plan: I modified the crash wall between the two
ramps at the gate - now there is a 2' wall separating
the two gates and changed the wall in to a steel post
and cable barrier to improve visibility.
Let me know if any further changes need to be made.
I have to issue an updated ground floor rendering to
Travis. Once I resolve all of the issues with
Transportation and Planning, I will issue a entire new
set for approval.
Thank you.
Daveed Kapoor