603 ARIZONA
http://utopiad.org/
Monday, November 17, 2008
ARB HEARING
Project was Continued due to:
1.Ground Floor Retail Floor needs to be entirely flat and Floor-to-Floor Height must be 15' Throughout.
2. Add Glass Block to The North and East Elevations.
3. Better Integrate the Solar Panels into the design.
Newer Post
Older Post
Home